Go to page content

Pedway removal

East pedestrian overpass on St. John's campus to be demolished

Campus and Community

By Mandy Cook

The east pedestrian overpass (pedway), which spans Prince Philip Drive near R. Gushue Hall on the St. John’s campus will soon close to the public.

Both the east and west pedways are being removed in the interest of public safety.

The west pedway, which carries pedestrians from the Chemistry-Physics building to the Earth Sciences building and the University Centre, will also be removed and a new pedway will be built connecting Chemistry-Physics with the University Centre.

At 8 a.m. on Wednesday, May 18, demolition work will begin on the structure in preparation for its complete removal in early June.

During this period, the main entrance to Bowater House (Door No. 1) will be closed, but will remain as a fire exit in the event of a requirement to evacuate the building.

Pedestrians are encouraged to use the newly renovated underpass in that area. Signs are in place to direct walkers to underpass entrances.

The underpass renovations include the addition of a lift, improvements to lighting, increased tunnel width, and the addition of an open entry point to the tunnel on the north side of the parkway. The tunnel is part of an underground network called MUNnels that connect major buildings on campus.

Members of the Memorial community will be notified in the coming weeks about the temporary closure of a section of Prince Philip Drive to facilitate the removal of the pedway and the associated traffic and pedestrian detours.


To receive news from Memorial in your inbox, subscribe to Gazette Now.


Latest News

Sensory input

Memorial University engineer aims to build N.L.'s first dedicated coastal test bed

Adding a little sugar

Brosnan Lecture to focus on our cell’s sugars and their effects on human health

Honouring tradition

Innu caribou coat design inspires Grenfell alumna's mural on Fine Arts balcony

Message from VP (administration, finance and advancement)  

Restructuring the Office of the Chief Risk Officer 

Aquarena renovations continue

Countdown to 2025 Canada Games aquatics events

Defining a pathway

From Corner Brook to the UN: Canada Research Chair leading the way on just energy transition